Traffic and Transport

Actions

Authority

When

Improve visibility at junctions to Pepo Lane and Creed Lane PCl, CCC (Highways) and CRCC Representatives

Now, during next road surfacing work as discussed with CCC Rep

Widen narrowest pavements, install drop kerbs for wheelchairs and prams, extend pavement outside Eastern Promise into Mill Lane and add drop kerb PC, CCC (Highways) and CRCC Representatives Short Term during road resurfacing as discussed with CCC Rep
40mph speed limit leading in to the existing 30mph limit for progressive deceleration. Add a 20mph limit at the school with new reflective sign (as installed at Grampound Rd School) PC, CCC (Highways) and CRCC Representatives

Short Term. To be discussed for inclusion during road resurfacing

Road Narrowing: to be assessed by road design engineers

CCC (Highways) Short Term if feasible
Pedestrian Crossing—will improve safety and slow traffic PC, CCC. firm approach is needed Short to Medium Term

Install 2nd Speed Check Light at other end of the village

PC, CCC This is an essential safety item Short Term
Speed Cameras: we believe local MP should review situation with view to recommending a speed camera for the village PC, CCC

Short to Medium Term

Investigate funding options for a community minibus

PC, Regeneration Group and Bus Hire Companies Short to Medium Term depending on funding needed
Bus Service—continue existing service and increase if possible. Lobby for relocation of bus stops to permit building of shelters

PC, CCC, Local Transport Companies

Now—to be investigated as part of resurfacing work
Car Sharing schemes for people working and living close to each other PC, Grampound Times Advertising Short Term
Glossary PC = Parish Council CRCC = Cornwall Rural Community Council CCC = Cornwall County Council